Taksim-4. Levent Subway Project

Kartal-Kadıköy Çekmeköy Subway Project

Üsküdar-Ümraniye-Çekmeköy Subway Project

NURNBERG Nursing Home

Tat Business Center Gallery Tunnels

Dudullu-Bostancı Subway Project

Pendik-Tavşantepe Subway Project

Levent-Ayazaga Stations Subway Project

Acarkent MNG Villas

Ataköy - Ikitelli Subway Project

Altunizade Station Private Pedestarian Tunnel to Acıbadem Hospital

Ordu Topçam HPP

Almer Business Center
-
Taksim-4. Levent Subway Project
Taksim-4. Levent Subway Project
Name of Work : Taksim-4. Levent Subway Project
Client : Istanbul Municipality
Contractor : ENKA-Dogus-Garanti Koza Joint Venture
Sub-Contractor : As Volkan Tünel
Location : Taksim/Istanbul
Date : 1998
Scope of Work :Concrete lining of main line tunnels (A-type, Ø6,50m, Length: 5600,00m) -
Kartal-Kadıköy Çekmeköy Subway Project
Kartal-Kadıköy Çekmeköy Subway Project
Name of Work : Kartal-Kadıköy Çekmeköy Subway Project
Client : Istanbul Municipality
Contractor : Astaldi-Makyol-Gülermak
Sub-Contractor : As Volkan Tünel
Location : Bostancı/Istanbul
Date : 02/02/2016 - 20/01/2017
Scope of Work : Bostancı station, final concrete lining of platform and connection tunnels(P type 246,00m length, B type 85,35m legnth). Gülsuyu Station, final concrete lining of platform and connection tunnels(P type L: 220,00m, B type L: 142,00m). -
Üsküdar-Ümraniye-Çekmeköy Subway Project
Üsküdar-Ümraniye-Çekmeköy Subway Project
Name of Work : Üsküdar-Ümraniye-Çekmeköy Subway Project Client : Istanbul Municipality Contractor : Dogus Construction Sub-Contractor : As Volkan Tünel Location : Ihlamurkuyu/İstanbul Date : 02.02.2017 Scope of Work :Ihlamurkuyu station, final concrete lining of platform and connection tunnels(P type 240,00m length, B type 84,00m legnth). İmam Hatip Station, final concrete lining of platform and connection tunnels(P type 75,68m2 length, B type 38,15m2 L: 137,5m). Excavation of stair tunnels with NATM method (B1-type A: 33,68m2 L: 13,00m, A: 33,68m2 L: 27,32m). Construction of pedestrian paths of outline tunnels between Necip fazıl- Dudullu stations (1000,00m) -
Tat Business Center Gallery Tunnels
Tat Business Center Gallery Tunnels
Name of Work : Tat Business Center Gallery Tunnels
Client : Yuksel Construction Co.
Contractor :As Volkan Tünel
Location : Zincirlikuyu/İstanbul
Date : 17/12/2000
Scope of Work : Construction of micro link tunnels between otopark-building(Length: 300,00m, Excavation, Reinforcement,concrete lining) -
Dudullu-Bostancı Subway Project
Dudullu-Bostancı Subway Project
Name of Work : Dudullu-Bostancı Subway Project
Client : Istanbul Municipality
Location : Dudullu/Istanbul
Contractor : Şenbay-Kolin-Kalyon
Sub-Contractor : As Volkan Tünel
Date : 02/18/2017-20/08/2018
Scope of Work : Excavation of Dudullu Station platform tunnels and connecting tunnels by the NATM method.(P-type Area: 59,56 m2 length: 120 m, B1.2- type A: 27,78 m2 L: 42,00 m ). Opening of (Ø18,00 m dia.
D: 43,00 m) the approach shaft. Excavation of CT-Type tunnel by the NATM method (A:59,56 m2 38,78 m2, L:62,00 m) -
Pendik-Tavşantepe Subway Project
Pendik-Tavşantepe Subway Project
Name of Work : Pendik-Tavşantepe Subway Project
Client : Istanbul Municipality
Contractor : Şenbay-Öztaş-Albayrak
Sub-Contractor : As Volkan Tünel
Yer : Pendik /İstanbul
Date : 09/09/2014 - 30/04/2016
Scope of Work : Pendik station platform, connection, and stair tunnels final concrete covering. (Isolation, reinforcement, concrete lining. P-type L: 240,00 m,
B1.2-type L: 140,00 m) The concrete covering of switch tunnel between Pendik-Tavşantepe stations (Isolation, reinforcement, concrete lining, L: 110,00 m). Maltepe Station, concrete lining of pedestrian connection tunnel (isolation, reinforcement, concrete lining, B-type 120,00 m)
Pendik Station’s installation, electricity, ventilation shafts excavation, concrete lining worksIsolation, reinforcement, concrete) Ventilation Shafts: (East Shaft Ø5,00m D: 25,00m, West Shaft Ø5,00m, D:21,00m),
Installation Shafts: (East Shaft Ø:5,00m D:17,00m West Shaft Ø:5,00 D:19,00m),
Electricity Shafts: (East Shaft Ø:3,00m D:16,00m West Shaft Ø:3,00m D:19,00m)
Yakacık Station’s installation, electricity, ventilation shafts excavation, concrete lining(Isolation, reinforcement, concrete) works Ventilation Shafts: (East Shaft Ø5,00m D: 13,00m, West Shaft Ø5,00m, D:14,50m)
Installation Shafts: (East Shaft Ø:3,00m D:13,00m, West Shaft Ø:3,00m D:13,00m)
Tavşantepe Station, installation, electricity, ventilation shafts excavation, concrete lining(Isolation, reinforcement, concrete) works Ventilation Shafts: (Doğu şaftı Ø5,00m D: 13,00m, Batı havalandırma şaftı : Ø5,00m, D:14,50m)
Installation Shafts: Hat-1(East Shaft Ø:2,75 D:13,00m, West Shaft Ø:2,25 D:14,00m), Hat-2(East Shaft Ø:2,25 D:13,00m, West Shaft Ø:2,75 D:14,00m),
Electricity Shafts: (East Shaft Ø:5,00m D:16,00m) -
Levent-Ayazaga Stations Subway Project
Levent-Ayazaga Stations Subway Project
Name of Work : Levent-Ayazaga Stations Subway Project
Client : Istanbul Municipality
Contractor : Garanti Koza-Alarko Joint Venture
Sub-Contractor : As Volkan Tünel
Location : Ayazağa/İstanbul
Date : 2007/2008
Scope of Work : 4.Levent-Ayazaga station, concrete lining of platform tunnels, switch tunnels, and connection tunnels (P type 220,00m length, B type 84,00m legnth, T type 220,00m). Execavation of main tunnels by the NATM method(Tunnels types Area: 22-102m2, Length: 11500,00m). Site grading works at depot area(68.0000m2). -
Ataköy - Ikitelli Subway Project
Ataköy - İkitelli Metro Projesi
Name of Work : Ataköy - Ikitelli Subway Project
Client : Istanbul Municipality
Contractor : AGA Enerji (Bayburt Group)
Sub-Contractor : As Volkan Tünel
Location : Atakent/İstanbul
Date : 29/08/2017
Scope of Work : M.Akif-Atakent İstasyonları Arasıyaklaşım şaftının açılması(Ø8,00m in dia., D: 48,00m). Ana hat tünellerinin ve bağlantı tünellerinin NATM kazı methodu ile kazılması ve nihai beton işlerinin yapılması(A Tipi, Area: 36,36 m2, Uzunluk:3000,00m). -
Altunizade Station Private Pedestarian Tunnel to Acıbadem Hospital
Altunizade Station Private Pedestarian Tunnel to Acıbadem Hospital
Name of Work : Altunizade Station Private Pedestarian Tunnel to Acıbadem Hospital
Client : Acıbadem Health Group
Sub-Contractor : As Volkan Tünel
Location : Altunizade/İstanbul
Scope of Work : Altunizade station, final concrete lining of pedestarian tunnels(Isolation, reinforcement, timber form, concrete, B type 280,00 m length) works. -
Ordu Topçam HPP
Ordu Topçam HPP
Name of Work : Ordu Topçam HPP
Client : General Directorate for State Hydraulic Works
Contractor : Garanti Koza
Sub-Contractor : As Volkan Tünel
Location :Topçam/Ordu
Date : 29/08/2003-2007
Scope of Work : Excavation of derivision tunnels, gallery tunnels and spillway tunnels by the NATM and the drill blast method (Ø:6,50m
Length:7500,00m). Construction of the power house. Construction of the tyrleon intake. Surge shaft excavation and final concrete lining works (Ø:8,00m D:81,00m). Surge shaft excavation and final concrete lining works (Ø:8,00m D:81,50m). Surge shaft excavation and final concrete lining works (Ø:8,00m D:61,00m).